Road Repairs - Flood Damage, Hay, NSW
Road Repairs - Flood Damage, Hay, NSW

Client: Hay Shire Council

Read More
Past, CurrentCristy Houghton2 March 2023
Channel Repairs, Romani, Hay, NSW
Channel Repairs, Romani, Hay, NSW

Client: Romani Water Scheme

Read More
PastCristy Houghton20 February 2023
Heavy Patching Program, Riverina Highway, Finley NSW

Client: Transport for New South Wales 

Read More
PastCristy Houghton20 February 2023
Shoulder Stabilising, Pine Street, Hay, NSW
Shoulder Stabilising, Pine Street, Hay, NSW

Client: Hay Shire Council

Adding GP Cement to sinking/failing residential shoulder and recycling asphalt into 150mm depth, double mixing to ensure uniform moisture for compaction and even cement content

Read More
PastCristy Houghton8 April 2022
Heavy Patching Program – Kidman Way, Darlington Point, NSW
Heavy Patching Program – Kidman Way, Darlington Point, NSW

Client: Murrumbidgee Shire Council

Various Patches on main highway, adding 1% quicklime and recycling asphalt into 250mm depth, double mixing to ensure uniform moisture for compaction and even lime content.

Read More
CurrentCristy Houghton6 April 2022
Riverview Estate Access Road – Barham, NSW
Riverview Estate Access Road – Barham, NSW

Client: Central Vic Stabilising

5600m2, Stabilised with 3% Quicklime (8.5kg/m2) double mixed to 150mm depth to ensure uniform moisture & lime content.

Read More
PastCristy Houghton6 April 2022
Crawfords Road/ProTen Farm Intersection Stabilisation, Hanwood NSW
Crawfords Road/ProTen Farm Intersection Stabilisation, Hanwood NSW

Client: Armstrongs Plant Hire

1835m2 - 60/40 Slag Lime spread at 12kg/m2 (3%) Double Mixed to 250mm Depth to ensure uniform moisture & lime content.

Read More
PastCristy Houghton6 April 2022
Carrathool Road subgrade stabilisation for 7km Re-construction
Carrathool Road subgrade stabilisation for 7km Re-construction

Client: Carrathool Shire Council

7000m x 9m – 63,000m2 subgrade improved using 9kg/m2 of Quicklime, completed in 3 weeks.

Read More
PastCristy Houghton30 March 2022
 
 